Home  ›  Process
Our Process

From your CAD to your receiving dock.

Five milestones, one deliverable: a qualified part you can release to production.

01

DFM Review

Geometry, process selection, and fit-for-purpose evaluated.

02

Tool Build

For Option A, Comcast Urethane works closely with a mold manufacturer in Marshall and manages the mold construction process from design to production parts. Tool ownership is customer-owned — the tool goes into production after payment is received. Or we run production from a mold you supply.

03

Formulation

Polyol system selected or custom-blended for target hardness, skin thickness, density, and service environment.

04

Mold & Cure

Meter-mix-inject or meter-mix-pour, demold, and post-cure to full properties.

05

Inspect & Ship

Dimensional and quality inspection.

Picking the right process

The first thing we decide.

Before we build a mold, we decide which process fits the part. Most of the time it's obvious, sometimes it isn't. Here's how we think about it:

Specify integral skin when...

User-contact surface mattersGrip, armrest, handle
Skin = finishNo paint or coating needed
SizeSmall to medium parts
FeelFirm surface + cushion interior

Specify RIM when...

Tolerances are tight±0.020 as molded
Surface is Class AAutomotive, consumer visible
Geometry is complexUndercuts, internal features
Volumes are higher> 5,000/yr typical

Specify flexible foam when...

Priority is cushioningSeating, positioning, impact
Surface feel isn't primaryUpholstered or covered
SizeAny — limited by mold
FirmnessTuned via IFD target

Specify pentane blowing when...

Cell structure mattersFiner cells than water-blown
Density consistencyTight batch-to-batch spec
Thermal performanceLower lambda required
Skin formationMore consistent integral skin
Typical timelines

How long does it take?

Prototype program

DFM review5 business days
First sample parts6–8 weeks (varies by size)
Stock-formulation pour3–5 days
Post-cure & inspection3 days
Typical total4–6 weeks

Production program

DFM & quote1 week
High-pressure machines3
Low-pressure machines5
Machine output range5 – 100 lbs / min
Pentane experience25+ years
Blowing agentsNon-ozone-depleting options
Mold temperatureTemperature-controlled molds
Mold arrangementsFlexible — single, gang, shuttle
Part weight rangeA few grams to 100+ lbs.
Pentane blowing roomState-of-the-art, Title V permitted
Production tool build6–8 weeks (varies by size and texturing)
Material qualification1–3 weeks
First-article inspectionPrior to production
Typical total6–12 weeks full production
Tooling options

Three ways to get to a mold.

We're flexible on where the tooling comes from. What matters is that the mold produces a good part — we'll tell you honestly if a customer-supplied tool has issues before we pour into it.

Option A — Comcast Urethane sourced tooling

You provideSTEP / IGES + 2D drawing
We deliverAluminum or steel tool via our Marshall mold partner
Prototype toolVaries by application
Production tool6–8 weeks (varies)
Tool ownershipCustomer-owned; tool goes to production after payment
Best forNew part development, full programs

Option B — You supply the mold

You provideCustomer-supplied production mold
We deliverCast parts, dimensional and quality inspection
Setup time1–2 weeks (mold qualification)
DFM reviewIncluded — we flag issues before pouring
Tool ownershipRemains yours throughout
Best forTransfer programs, second-source supply

Option C — We build from your part design

You providePhysical part or detailed sketch
We deliverReverse-engineered CAD + tool + parts
TimelineAdd 1–2 weeks for CAD generation
Best forLegacy parts, obsolete tooling replacement

What we need to start

PreferredSTEP + PDF with GD&T
Also acceptedIGES, Parasolid, SolidWorks native
MinimumSketch + dimensions + problem description
First stepDFM review, 5 business days

Ready to start?

Upload a CAD or drawing. Your DFM memo lands in your inbox within 5 business days.

Start a DFM Review